Pumping scheduled for upgrades

Pumping scheduled for upgrades

$4.1 million OK’d for regional irrigation
Ar 140519805
Ar 140519805
The back three of the pumps will be replaced. Each pump has 500-horsepower and goes down 29 feet below the floor.
Ep 140519805
Ep 140519805
DWCD engineeer Ken Curtis points out the electrical units that will be replaced at the pumping station.
click here to add your event
~ Events
click here to add your event
~ Events